Reorder Point
\[ROP=dL+SS\]

Variables

ROPreorder point (units)
daverage demand rate (units/time)
Llead time
SSsafety stock (units)

Description

What is this formula?


The Reorder Point (ROP) determines the inventory level at which a new order should be placed to avoid stockouts during supplier lead time.


It combines expected demand during lead time with an additional safety stock buffer.


When to use it


Use this formula when:


- Managing inventory replenishment.

- Preventing stock shortages.

- Planning purchase orders.

- Improving service levels.

- Optimizing warehouse operations.


Example


A company sells:


d = 50 units/day


Supplier lead time:


L = 8 days


Safety stock:


SS = 100 units


Formula:


ROP = dL + SS


Substitution:


ROP = (50×8) + 100


ROP = 500 units


Result:


A new order should be placed when inventory reaches 500 units.


Applications


- Inventory management

- Supply chain planning

- Purchasing operations

- Warehouse management

- Service level control


Note


This model assumes average demand and lead time values. In practice, demand variability and supplier uncertainty are often incorporated through the safety stock term to achieve a desired service level.

fCalc · Android

Take this formula to fCalc and evaluate it directly on your Android device.

Get it on Google Play

Content language

EnglishSpanish